|
Item |
Details |
|
Report No. |
ASSIR.26.33 |
|
Client Name |
Mostaqbel Almadina for Emulsified Asphalt Laboratory معمل مستقبل المدينة لانتاج الاسفلت المستحلب |
|
Project / Site Name |
Mostaqbel Almadina |
|
Location |
Basra |
|
Area Inspected |
Emulsified Asphalt Laboratory |
|
Inspection Date |
14/02/2026 |
|
Inspector Name |
Kadhim Shawi Nayyef |
|
Client representative Name |
|
|
Type of Inspection |
Periodical Safety Inspection |
|
Plant / Lab Operating |
Yes |
|
Result of Inspection: |
Passed with comment (5-6) |